Rail vehicles can remain in service for 40 years or more, yet the electrical components which keep them running have significantly shorter commercial lives. Managing obsolescence is therefore essential to maintaining fleet reliability, operational availability and long-term value for money. Here, Jack Teichman, In Service Engineering Support Lead at Petards shares his experience and perspective.

Poorly managed obsolescence can leave critical equipment difficult or uneconomical to repair, increasing maintenance costs and the risk of service disruption. At Petards Rail, we recognise that effective obsolescence management is not simply about replacing unavailable components. It is about anticipating risks, protecting customer investment and identifying opportunities to improve equipment throughout its operational life.

Although obsolescence cannot be prevented, its impact can be significantly reduced through early identification and forward planning. The correct response may involve sourcing alternative parts, prevention of known failure modes, redesign of equipment or recovery of obsolete components where possible.

Petards Rail’s in-house obsolescence software tools support proactive market scanning and component lifecycle monitoring, allowing us to identify emerging availability risks across our product Bills of Materials (BoMs) before they become operational problems. This intelligence enables preventative action, including alternative component sourcing, strategic stockholding and planned engineering changes, reducing the likelihood of costly, reactive interventions.

There is no single solution to obsolescence. Each issue requires a proportionate engineering response, balancing technical feasibility, safety, cost and remaining equipment life. Where available, Form, Fit and Function (FFF) replacements offer an efficient solution, subject to appropriate engineering verification and approval.  More complex challenges may require Printed Circuit Board (PCB) modifications, redesign or reverse engineering. When significant engineering investment is necessary, Petards Rail takes the opportunity to review the wider BoM, identifying other obsolete or at-risk components that can be addressed through a coordinated modification. This approach reduces repeated engineering interventions, approval activities and potential fleet disruption.

Not every issue requires a complete redesign. Targeted modifications can mitigate known failure mechanisms, reduce component stress or extend equipment life while longer-term solutions are developed. Where Line Replaceable Units (LRUs) become beyond economical repair, controlled recovery of serviceable components can also preserve repairability and fleet availability, subject to appropriate testing and traceability.

Great British Railways’ (GBR) direction towards managing rolling stock as a nationally coordinated portfolio reinforces the importance of long-term asset planning, flexibility and whole-life value. While it is impossible to predict precisely how individual fleets will be deployed or operated over the coming decades, Petards Rail is committed to designing products that can accommodate future technological developments and changing operational requirements with minimal disruption. By considering modular architectures, standardised interfaces, maintainability and upgradeability from the outset, we aim to protect existing investments while enabling future technology refreshes. This approach supports the integration of advances in processing, communications, cybersecurity and functionality without unnecessary wholesale equipment replacement – designing for change is as important as designing for today’s requirements. 

An often-overlooked part of obsolescence management is supplier, operator and maintainer engagement. Early customer engagement is crucial in safeguarding operations in the short term and provides time to plan engineering approvals, vehicle testing, last-time purchases and fleet modifications before component availability becomes critical.
Coordinating these activities with planned maintenance programmes can minimise operational disruption and reduce overall costs.

Obsolescence resolutions can deliver benefits beyond continuity of service. Where an LRU is removed for modification, additional inspection and testing can identify developing faults and confirm equipment condition. Similarly, approved reliability improvements can be incorporated into planned obsolescence modification programmes, helping to improve reliability, performance and service life span.

Petards Rail takes a holistic approach to obsolescence, combining in-house engineering expertise, proactive obsolescence monitoring and detailed product knowledge to assess risks at component, LRU and fleet level. This approach allows us to prioritise critical issues and combine engineering changes where practical to minimise disruption and maximise whole-life value. Obsolescence is unavoidable, but operational disruption need not be. Through early identification of risk, safeguarding repairability and customer collaboration, we can extend the service life of electronic equipment while improving reliability and performance.

At Petards Rail, our commitment extends beyond keeping today’s equipment operational. We aim to ensure our technology remains supportable, adaptable and economically viable for the railway of tomorrow.